image image image image image image image image image image
Master Plan
OFFICE
SARBEX 2010
3 Storey Shophouses
Double Storey Semi Detached Type A perspective
Double Storey Semi Detached - Type B
Double Storey Terrace - Type A Presepctive
Double Storey Terrace Type B - Prespective
Single Storey Terrace Type A- Prespective
Single Storey Terrace Type B - Prespective
1 2 3 4 5 6 7 8 9 10

Announcement

  • 1
  • 2
six pack abs
CENTRAL CITY - Single Storey Terrace - Type B

Prespective

alt

 

Floor Plan

Land Size From:2.38 POINT/1,033 SQFT
Wall Up Area:527 SQFT / 18 FT x 31 FT

alt

Specification

 

Structure
Reinforced concrete framework.

Roofing
Concrete roof tiles to the main roof. Metal roofing applies to all roofs.

Wall
Brick wall plastered on both sides.

Wall Finishes
Weather resistant paint to external walls and emulsion paint to internal walls. Glazed wall tiles to bathrooms and designated wall for kitchen.

Floor
Ceramic floor tiles to living, dining, bedrooms, bathrooms and kitchen.

Ceiling
Plaster ceiling with emulsion paint to living, dining, kitchen, utility and all bedrooms. Asbestos free cement board ceiling to bathroom and car porch.

Doors
Solid panel door for main entrance door and rear door. Wooden door for internal rooms and waterproof door for bathroom.

Windows
Aluminium frame windows with tinted glass.

Bathrooms
Standard wash hand basin and sanitary ware.

Kitchen
1 unit of kitchen sink.

Electrical
Air conditional point, lighting points and power points, telephone point, TV point and gate lighting point.

Fencing
Mild steel gate for main gate. Chain link fencing to others.


Please note that the purchase price shall not be inclusive of the following items:-
(a) Lighting and fittings
(b) External landscaping
(c) Electricity and water meter deposits and connection fees; and
(d) All furnishing in the show house including window curtains
(e) Iron Grill

Price List

Please refer to:-

http://www.facebook.com/photo.php?fbid=129406940537382&set=a.110962729048470.19108.100004042313161&type=3&theater

Site Plan

Coming Soon!

Info

 

[Clouse 3(1)]

Schedule of payment of purchase Price

Progress Payment

Installment Payable Amount                                                                                                       %                           

1.            Immediately upon the signing of this Agreement                                                          5              RM


2.            Without fourteen (14) days after receipt by the Purchaser of the
                Vendor’s written notice of the completion of:-

(a)          Foundation Works                                                                                                             15           RM

(b)          Reinforced concrete framework with walls in position                                                   20           RM

(c)           Roofing, internal plastering, electrical conduits (without wiring)                                   20           RM
                and plumbing (without fittings)

(d)          External plastering ceiling, doors and windows including glazing,                                20           RM
                soil drainage and septic tank

(e)          Driveway, apron, perimeter drain, fencing, gate and painting                                       15           RM

(f)           The issuance of Occupation Permit                                                                                  2.5          RM

(g)          The issuance of Land Title                                                                                                 2.5          RM
 

                                                                                                                                TOTAL:              100         RM